R4 Zoning in NYC: FAR, Height and Setbacks
What can you build in R4?
In R4, any type of residence is permitted, from detached houses to rowhouses and apartment buildings. The standard maximum residential FAR is 1.00, or 1.50 on a qualifying residential site, and standard buildings can reach up to 35 ft. Zohgo shows the exact numbers for any NYC address, free.
R4 is a general residence district that allows every housing type, from detached houses to small apartment buildings, kept under a 35 ft height limit.
Floor area (FAR)
- Standard maximum residential FAR: 1.00 (ZR 23-21).
- On a qualifying residential site: 1.50 FAR.
- Community facility FAR: 2.00, with lot coverage up to 60% on corner lots and 55% on interior or through lots (ZR 24-11). Some uses, such as non-profit institutions with sleeping accommodations, can have lower limits (ZR 24-111).
- FAR (floor area ratio) is total zoning floor area divided by lot area. On a 2,500 sq ft lot, 1.00 FAR means 2,500 sq ft of floor area.
- Maximum dwelling units: residential floor area divided by 680, the dwelling unit factor (no factor for qualifying senior housing) (ZR 23-52).
Height and setbacks
- One- and two-family homes (detached, semi-detached or zero lot line) use the pitched-roof envelope: walls up to 25 ft, then sloping planes to a 35 ft ridge (ZR 23-421).
- Other residences here, such as small apartment buildings, have a 35 ft maximum building height (ZR 23-422).
- On qualifying residential sites (and for qualifying senior housing), the limits are a 35 ft maximum base height and a 45 ft maximum building height, with a setback above the base (ZR 23-424).
Yards, lot coverage and lot size
- Front yard: 10 ft deep (ZR 23-321). On a corner lot, one front yard can be 5 ft shallower, and you can match a shallower neighboring front yard, but never less than 5 ft.
- Side yards: Detached houses need two side yards, each at least 5 ft wide (ZR 23-332). Semi-detached and zero lot line houses need one 5 ft side yard, plus an 8 ft open area between buildings where the neighbor is a one- or two-family house. Other building types (like attached rowhouses or apartment buildings) need no side yard, but any open strip along a side lot line must be at least 5 ft wide.
- Rear yard: On interior lots, detached and zero lot line buildings need a 20 ft rear yard up to 75 ft high. Semi-detached and attached buildings need 30 ft on lots narrower than 40 ft, and 20 ft on lots 40 ft or wider. Where a building rises above 75 ft, that portion needs 30 ft (ZR 23-342). Shallow lots that existed in 1961 can get a reduced rear yard, never under 10 ft.
- Lot coverage: For one- and two-family homes: 60% on interior and through lots, 80% on corner lots (ZR 23-361). Apartment buildings, where permitted, can cover 80% of an interior lot and 100% of a corner lot.
- Minimum lot size: 2,850 sq ft and 30 ft wide for a detached or zero lot line one- or two-family house; 1,700 sq ft and 18 ft wide for other residences where they are permitted (ZR 23-11).
What you can build in R4
Any type of residence is permitted, from detached houses to rowhouses and apartment buildings (ZR 22-121, 22-122).
City of Yes changes
- City of Yes for Housing Opportunity (adopted December 5, 2024) added a higher tier for qualifying residential sites: 1.50 FAR here instead of 1.00, a height limit of 45 ft, and any type of residence (ZR 23-21, 23-424, 22-122).
- A qualifying residential site is, in short: a lot of at least 5,000 sq ft in the Greater Transit Zone with frontage on a wide street or the short end of a block (not in R1 or R2); or a lot with an existing community facility building (with conditions); or, in R3-2, R4, R5 and R5B, a lot with qualifying senior housing. Where residential floor area on such a site exceeds 50,000 sq ft, part of it must be affordable (ZR 12-10).
- It also allowed ancillary dwelling units (ADUs): one extra home of up to 800 sq ft per one- or two-family residence, with conditions (ZR 12-10).
Zohgo shows the zoning district, FAR, height and setbacks for a real NYC address in about a minute.
Check any NYC address free on ZohgoR4 zoning FAQ
What is the maximum FAR in R4?
The standard maximum residential FAR in R4 is 1.00. On a qualifying residential site it is 1.50. Community facilities such as schools or houses of worship can generally reach 2.00 FAR.
How tall can you build in R4?
In R4, one- and two-family homes use a pitched-roof envelope (25 ft walls, 35 ft ridge), and other buildings are capped at 35 ft. Qualifying residential sites can go up to 45 ft.
How many apartments can I build on an R4 lot?
On a 25 x 100 ft lot (2,500 sq ft) at the standard 1.00 FAR, the maximum residential floor area is 2,500 sq ft. Dividing by the dwelling unit factor of 680 gives 3.68, so about 3 units (a fraction of 0.75 or more counts as one more unit). Qualifying senior housing has no unit cap from this rule (ZR 23-52). Note that the lot still has to meet the minimum lot size, and the building has to fit the height and yard rules.
Can I build an ADU in R4?
Generally yes. City of Yes created ancillary dwelling units (ADUs): one extra home of up to 800 sq ft of floor area for each one- or two-family residence on the lot. The owner must live on the lot when the ADU is first occupied. Backyard ADUs are not allowed in historic districts or certain flood-risk areas. A backyard ADU in the rear yard is limited to one story and 15 ft (ZR 12-10, 23-341).
Nearby districts
Sources
Every number on this page comes from the NYC Zoning Resolution, read October 25, 2026:
- ZR 11-122: https://zr.planning.nyc.gov/article-i/chapter-1/11-122
- ZR 12-10 Definitions: https://zr.planning.nyc.gov/article-i/chapter-2
- ZR 22-121: https://zr.planning.nyc.gov/article-ii/chapter-2/22-121
- ZR 22-122: https://zr.planning.nyc.gov/article-ii/chapter-2/22-122
- ZR 23-11: https://zr.planning.nyc.gov/article-ii/chapter-3/23-11
- ZR 23-21: https://zr.planning.nyc.gov/article-ii/chapter-3/23-21
- ZR 23-321: https://zr.planning.nyc.gov/article-ii/chapter-3/23-321
- ZR 23-332: https://zr.planning.nyc.gov/article-ii/chapter-3/23-332
- ZR 23-342: https://zr.planning.nyc.gov/article-ii/chapter-3/23-342
- ZR 23-361: https://zr.planning.nyc.gov/article-ii/chapter-3/23-361
- ZR 23-421: https://zr.planning.nyc.gov/article-ii/chapter-3/23-421
- ZR 23-422: https://zr.planning.nyc.gov/article-ii/chapter-3/23-422
- ZR 23-423: https://zr.planning.nyc.gov/article-ii/chapter-3/23-423
- ZR 23-424: https://zr.planning.nyc.gov/article-ii/chapter-3/23-424
- ZR 23-52: https://zr.planning.nyc.gov/article-ii/chapter-3/23-52
- ZR 23-341: https://zr.planning.nyc.gov/article-ii/chapter-3/23-341
- ZR 24-11: https://zr.planning.nyc.gov/article-ii/chapter-4/24-11
- ZR 24-111: https://zr.planning.nyc.gov/article-ii/chapter-4/24-111